Blog
Focused Improvement Training. CAP-Do and the 16 Major Losses
The packer was equipped with 12 obsolete pneumatic control valves...
Read More »Overall Equipment Efficiency and Effective Process Duration Calculations Sheet
If, A: Actual working time of one shift = B: Scheduled down time of one shift = C: Loading time of one shift = A-B = D: Stoppage loss time of one shift = E: Operating time of one shift = C-D= G: Number of units processed in one shift…
Read More »QA Matrix
Quality Assurance Matrix (QA Matrix) A QA matrix is a table that delineates how defects are being built into products under current conditions, in a process in which one wishes to assure quality. This matrix enables managers to see at a glance which processes are generating defects, which processes’ equipment…
Read More »Activity Boards & Visual Management. Principles and Guide
Top Reasons for Failure: Boards not updated: discipline breakdown, lack of pride, low priority for TPM activities.
Read More »



